1. Our Goss press is down 48 hours before a deadline. What do we do first?
-
2. What exactly is a Goss press reconfiguration?
-
3. Is the Goss Community printing press still worth keeping?
-
4. What does a Goss press reconfiguration cost, and what's NOT in the quote?
-
5. What is the cost of a 3D printer, and can an aluminum 3D printer make Goss spares?
-
6. Would a Mimaki DTF printer be a better investment than reconfiguring our press?
-
7. How fast can we get a Goss press reconfiguration when the deadline is hard?
I'm the person Goss sends when a press is down and the deadline isn't. In my role coordinating emergency press repair and press reconfiguration work, I've handled a lot of rush calls over the years—probably 200-plus, though I'd need to check our service log for an exact count. Most of those jobs involve a Goss Community press, and the questions I get are almost always the same.
So here's the FAQ I tend to give, sometimes standing next to a press that should be running:
1. Our Goss press is down 48 hours before a deadline. What do we do first?
Stop looking for a repair price and start triaging. Three questions matter more than anything else: what exactly failed, can the rest of the press run a reduced product while you fix it, and how much does missing this run actually cost?
In March 2024, a client called about 36 hours before a deadline. Their folder camshaft had snapped, and they needed 40,000 directories for a trade conference the next day. Normal parts delivery was three or four days. We found a compatible assembly at another print facility in the Midwest, paid a few hundred dollars in emergency freight on top of the base cost, and got the part onto their pressroom floor before midnight. Their alternative was a $50,000 penalty clause.
That story ended well. Not all of them do. The reason I tell it is that the better answer starts a year earlier with a critical spares audit. Folder cams, gripper bars, drive belts—the parts that stop a Goss press dead are the ones you never needed until the worst possible week.
2. What exactly is a Goss press reconfiguration?
That phrase sounds like jargon, but it's actually a practical service. Reconfiguration means changing a press so it can make something it wasn't originally set up to make. It might mean adding a unit for extra color, converting a broadsheet line to tabloid, repositioning a folder, or moving an entire press line from one building to another.
For a lot of publishers running a Goss Community, reconfiguration is the difference between retiring a machine and giving it another decade of productive life. It is not maintenance, and it doesn't replace maintenance. It simply makes sure the press is arranged to earn its keep for whatever you're going to print next.
3. Is the Goss Community printing press still worth keeping?
Yes, if the work is there and the press has been maintained. I've seen Community presses from the 1970s that still run a solid daily product, and I've seen shops where the same model is a money pit because nobody invested in it.
Try not to frame it as Community versus digital. Digital printing isn't the enemy—it's the right tool for shorter runs and different applications. At the run lengths a web press is built for, a maintained Community still delivers a cost per impression that most digital machines can't touch, in my experience.
There's also a part of this decision that surprises publishers: distribution drives the format. According to USPS rates effective January 2025 (usps.com/stamps), a First-Class Mail letter (1 oz) costs $0.73 and a large envelope costs $1.50. USPS adjusts rates periodically, so verify current pricing before you lock product pricing. The point stands, though: when mailing costs go up, page count and trim size can matter as much as press speed. That's a big reason publishers call us about reconfiguration—they need a product shape that can still be mailed affordably.
4. What does a Goss press reconfiguration cost, and what's NOT in the quote?
I can't quote your reconfiguration from memory, and you should be suspicious of anyone who quotes yours without walking the pressroom floor. That's not a dodge. The range is too wide until we know the condition of the units, the electrical setup, and the product you need to make.
A transparent quote lists what's included: disassembly, new parts, rewiring or motorization where needed, installation, alignment, test runs, and training for your crew. It also lists what is not included: rigging or crane rental, foundation work, electrical service upgrades, and disposal of old equipment. If a vendor hands you one lump sum with no breakdown, ask why.
I've learned to ask what's NOT included before asking what's the price. The vendor who puts every fee on the table upfront—even when the total looks higher—usually costs less in the end. And per FTC business guidance (ftc.gov/business-guidance), advertising claims have to be truthful, not misleading. I'd argue the same standard should apply to a capital equipment quote.
5. What is the cost of a 3D printer, and can an aluminum 3D printer make Goss spares?
This one comes up more each year, usually from shops that are tired of waiting on parts. Behind a lot of searches for what is the cost of 3D printer, the real question is whether a printer can replace an OEM spare-parts shelf. Those aren't the same question.
On price: a capable polymer printer for jigs and prototypes can cost a few thousand dollars. An aluminum 3D printer—a real metal system—is in a different league. When customers bring me their vendor quotes, I usually see pricing starting in the low six figures, before you add metal powder, heat treatment, post-processing, and someone qualified to run it. This market shifts quickly, so verify current pricing with machine builders rather than trusting a service tech's memory.
On parts: for low-risk items like guards, brackets, and setup tooling, 3D printing is a legitimate bridge. For structural press components, I'd be careful. A failed printed part on a folder running at full speed isn't a $10 problem; it's a scrapped run, damaged cylinders, and an operator safety risk. OEM parts carry material certifications and verified dimensions for a reason.
I've seen customers print temporary covers to keep a line running while the real part was in transit. That's a good use of the technology. Starting your print-on-demand parts program with folder cams and gripper bars is not.
My experience here is from the press side. If your shop does mostly low-speed commercial work, you might weigh the risk differently. For high-speed newspaper folders, I'd buy the critical spares first and treat metal printing as an experiment, not a supply chain.
6. Would a Mimaki DTF printer be a better investment than reconfiguring our press?
This comparison shows up in budget meetings more than you'd think. A weekly paper sees a local market for custom apparel, and a Mimaki DTF printer is a proven way into that market. It's a fair question, not a crazy one.
But it's not really either/or. A DTF printer puts transfers on film for garments. A Goss press puts ink on newsprint at thousands of impressions per hour. These are different products solving different problems. If your print volume is shrinking and your team keeps hearing requests for branded merchandise, a DTF line might pay for itself quickly. What I haven't seen is a DTF printer make an aging web press's maintenance issues go away.
The two purchases also have different time horizons. A DTF line is modular, relatively easy to learn, and can be running in weeks. A press reconfiguration is a capital project with a longer payoff. You can do both, and the shops that manage it best treat DTF as a new service line, not a replacement for what the press already does.
7. How fast can we get a Goss press reconfiguration when the deadline is hard?
As fast as the scope allows, and never faster than safety permits. That's not a slogan; it's risk control. The timeline depends on parts availability, electrical work, building access, and how much test time we can protect before your first live run.
A small reconfiguration, like adding a half-deck or repositioning one unit, can happen over an extended weekend if all parts are staged in advance. A full line move or a folder replacement is usually measured in weeks. Last year we completed a four-unit Community line in 11 days—or maybe 12, I'd need to check the project file—because a publisher had committed to a launch date. The same job normally books out at four to six weeks.
What made that 11-day job possible was staging, overtime, and a 48-hour buffer at the end for test runs. I won't promise guaranteed zero downtime. Anyone who does is selling something. I promise a realistic schedule with room built in for the surprises that show up on any pressroom floor.